Custom Sourcing
Nearly forty years of relationships with demolition crews, salvage yards, and European dealers. If it exists and it is for sale, we can usually find it.

When Stock Isn’t the Answer
Some projects need something the shelf does not have: forty thousand brick of one blend, a specific glazed header, a run of stone copings in a single length, or antique paving in a colour that has to sit beside an existing terrace.
We work the network—demolition contractors in the Gulf South and Midwest, English and French salvage yards, and other dealers—and come back with what is genuinely available, at what price, on what date. No maybes.
How it works
Define the target
Colour, size, quantity, and the date it has to be on site. The more precisely you can describe the target, the faster the search.
We search and verify
Demolition contractors in the Gulf South and Midwest, English and French salvage yards, and other dealers. We verify what is actually there rather than repeating a rumour.
Firm quote and date
You get a real price and a real date, or a clear no. We would rather tell you it cannot be done than string you along for a month.
Reserved and shipped
Material is secured, held for your phase dates if needed, and shipped palletized to your site.
Why projects come to us
Volume sourcing
Forty thousand brick of one blend is a sourcing problem, not a stock problem. It is the kind of thing this service exists for.
European salvage access
Established relationships with English and French salvage yards, which is how the Bath stone, French limestone, and antique flagstone get here.
Honest timelines
In-stock material ships in 48 hours. Container sourcing runs 8–14 weeks. We give you the real number, not the one you want to hear.
Held for phases
On multi-phase work we will hold material against later phases so phase three still matches phase one.
From the yard


.png)

Questions we get asked
Is there a minimum?
There is no published minimum — it depends entirely on what you are after. A single missing architectural element and a forty-thousand-brick facade are both things we have gone looking for. Call and describe it and we will tell you whether it is worth chasing.
Do I pay upfront?
Terms depend on the material and the scope, and sourced material is a different proposition to stock. Hays and Ben will set that out clearly in the quote before anything is committed. Note that stock orders can be cancelled within 24 hours if the pallet has not yet been prepared for shipment.
How far ahead should I start?
For anything coming out of Europe, assume 8–14 weeks plus your own programme, so start at design stage rather than at order stage. For domestic salvage, a few weeks is often enough. The earlier you start, the more options you get.
Related pages
Get the Right Materials—On Time, Every Time
Supplying architects, builders, and homeowners with authentic reclaimed brick and stone—ready to ship when you need it. No delays, no uncertainty—just quality materials, expert service, and fast delivery to keep your project on track.
